Thinking of remodeling your bathroom? Discover the various phases encompassed in the renovation journey.
Even though the bathroom occupies a relatively small space in terms of square footage, renovating it can be a challenging task. Due to its high functionality and the multitude of tasks it performs, the renovation process for this heavily utilized area involves intricate technicalities. This comprehensive guide will provide you with a step-by-step understanding of the renovation process. Furthermore, it will assist you in establishing a practical budget in collaboration with professionals based on your specific requirements and ensure a seamless execution of the project.
Step 1: Planning the layout
The initial step in the renovation process involves meticulous layout planning. This aims to optimize the utilization of space and establish distinct wet and dry zones within the bathroom. Effective space planning entails strategic placement of sanitary fixtures, sanitaryware, and built-in storage while allowing sufficient room for movement and circulation. The professional will develop an electrical layout that clearly indicates the precise locations for electrical switchboards, exhaust fans, and geysers. Comprehensive working drawings will be generated based on the bathroom's concept and the chosen tiles. Additionally, these drawings will be utilized to accurately calculate the necessary quantity of tiles needed for the entire bathroom renovation. Note:your professional may suggest modifying the current plumbing lines and positioning of sanitaryware to enhance the overall efficiency and functionality of the bathroom layout.
Step 2: Demolishing the old bathroom
Prior to the upgrade of the existing bathroom, it will be necessary to remove all sanitaryware, sanitary fixtures, plumbing lines, electrical wiring, and tiles. This process may generate a significant amount of dust and dirt within the house. If you have a desire to reuse any of the existing sanitaryware, sanitary fixtures, or accessories, it is recommended to carefully remove and store them in a secure location for future reinstallation. The professional will examine the walls, ceiling, and flooring for any presence of mold or mildew and undertake cleaning and repairs as needed. Step 3: Installing plumbing lines
The professional will engage a plumber to adjust the plumbing lines according to the intended placement of the sanitaryware and fixtures. It is important to note that if the bathroom includes a wall-mounted toilet, additional brickwork will be necessary behind the toilet to accommodate the concealed flush mechanism. Step 4: Installing electrical wiring
Subsequently, the electrician will proceed to install the electrical wiring based on the precise locations indicated on the drawings for ceiling lights, alcove lights, mirror lights, shaving point, exhaust fan, switchboards, and geyser. Step 5: Fixing the countertop
The countertop will be custom-cut according to the proposed design and securely affixed to the wall. Various countertop materials such as granite, marble, engineered quartz, and solid surface can be used. Furthermore, the installation of the bathtub or shower cubicle will take place during this phase. Step 6: Tiling the walls and ceiling
The next step involves installing the skirting and wall tiles in accordance with the proposed design. Following that, the floor tiles will be laid down, ensuring the appropriate slope is achieved to facilitate proper water drainage. Once the tiles have dried, the tile joints will be sealed using grouting. Step 7: Fabricating the bathroom cabinetry
The following stage involves the involvement of carpenters who will craft the cabinetry, either beneath the countertop or in other designated areas of the bathroom. Step 8: Painting of the walls
Now comes the phase of painting the ceiling and walls, particularly if the design does not involve a floor-to-ceiling tiled surface. Professionals typically recommend using satin-finish or semi-gloss finish paint for these areas, as they provide moisture resistance. Step 9: Installing electrical fixtures
The electrician will then proceed to install all the lights, including alcove lights, as well as the exhaust fan, switchboards, and geyser. It's worth noting that alcove lights can enhance visual depth and create a sense of spaciousness in the bathroom. Step 10: Installing the sanitaryware
As the bathroom nears completion, the plumber will install the sanitaryware, which includes the sink and toilet (commode). During this stage, all the sanitary fixtures, including faucets, hot and cold mixers, hand showers, overhead showers, and hand-held bidet sprayers, will be installed. Step 11: Fixing the accessories
Now is the time to install the glass panels of the shower cubicle. Accessories such as shelves, soap dispensers, soap trays, toilet paper holders, robe hooks, and towel racks are then securely fixed in place. Lastly, the mirror is installed, adding the finishing touch to your bathroom. At this point, your bathroom is fully complete and ready for use.